Over two months have passed since the last post.
A lot has happened since then. That post was written during one of my last days of working for MIP. After that I moved over to Genesis and with that I had to give back my notebook that had everyting on it. I did save everything but getting the environment back up has taken some time and I suppose my new job has kept me busy.
Anyway. Where were we?
The roof was going up in September...
This is downstairs looking at the kitchen.
The boys room with ceiling in.
Wells had to put a flag up when we got to the top.
It was time for the flat to go now and make way for the new garage. Kessi inspects the scene...
The south side of the house.
The North-east Side of the house. Doors are in! Looking at the dinning room area.
Stairs are in. No longer do we need to climb through the upstairs window...
The boys room about to get their floor laid.

Disaster. Early one Monday morning, the site-office and storeroom below it catch fire.
The heat from the fire cracked all the windows on the south side. All had to be replaced.
And so that pretty much has been what has happened over the last 2 months.